This project involves constructing a segment of Bayou Gulch Road between Pradera Parkway and Scott Avenue. During 2021, the County advanced final design, drainage studies, geotechnical design, and subsurface utility engineering (SUE). Construction plans and specifications are anticipated to be completed in January 2023. Construction is currently anticipated to begin in April 2023. The project will consist of reconfiguration of the alignment of Bayou Gulch Road between Vistancia Drive and Scott Avenue, and improvements to the drainage infrastructure which includes storm sewer improvements and extending the existing box culvert. The proposed alignment will have asphalt pavement and concrete sidewalks for pedestrian and bike access.