01.

Help Me With...

Select from list
My Residential Property
My Driver's License or Vehicle Registration
Requesting Assistance
Elections
Health Department

02.

Select from list
My Property Valuation
Understanding My Valuation
Paying My Property Tax
Neighborhood Sales
Building Permits
Vehicle Registration - New Stickers
Vehicle Registration - New Vehicle
Drivers License - New or Renew
New Resident Vehicle Registration
Adult Protection
Child Welfare
Child Support
Child Care
Financial Assistance
Medical Assistance
Food Assistance
Register to Vote / Update Voter Registration
Upcoming Election Information
Ballot Drop Box Locations
Voter Service and Polling Centers
Birth/Death Records
Restaurant Inspections
Community Health
Child Care Center Inspections
Septic System Inspections
Emergency Preparedness & Response
Disease Surveillance
Mental and Behavioral Health Education
Community Health and Clinical Services
Women, Infants and Children

03.

×
× Close
Public Works

Bayou Gulch Road (Pradera Parkway to Scott Avenue) Project

Under Construction

Budget

$3,717,355

Project Manager

Cori Cowan
[email protected] 303-660-7490

Contractor

IHC Scott, Inc.

Project Update

Current Road Closure: Bayou Gulch Road, between Scott Ave and Vistancia Drive, will remain closed until May 2024. The project will be in winter shutdown starting December 4, 2023, and construction operations will be limited until March 2024. During this time, the road is closed to pedestrians, bicycles, and motor vehicles, including weekends, evenings, and holidays. Access to the Vistancia neighborhood is now open through the north entrance.

See “Schedule Section” below for further information.

Bayou Gulch Road Project Fact Sheet

Description

Douglas County is improving Bayou Gulch Road between Pradera Parkway and Scott Avenue by realigning the roadway, installing new asphalt pavement, improving the storm infrastructure, and installing a continuous sidewalk throughout the project. After construction, the entire road – from Pradera Parkway to Scott Avenue – will have one lane in each direction paved with new asphalt, three-foot shoulders, and a continuous concrete sidewalk for pedestrian access.

This project also includes:

  • A new urban storm sewer system that will outlet into an existing permanent water quality pond located on the Cielo Development which was expanded by Douglas County last year in preparation for this project.
  • An extension of a dual 6’ by 6’ box culvert to accommodate the new alignment and “ultimate” four-lane major arterial section roadway width.

Schedule

Construction started on June 26, 2023, and is expected to be completed in May 2024. Working hours are 7 a.m. to 6 p.m., Monday through Friday. Occasional Saturday work is possible but must be approved by Douglas County Public Works. There will be no work during the holidays.

Road Closures: 

Bayou Gulch Road will be CLOSED in different roadway sections within two different phases of the project, as follows:

  • Phase 1 – full closure of Bayou Gulch Road from Pradera Parkway to Scott Avenue – road closure dates are July 17 to Oct. 31, 2023. The Phase 1 closure is now open.
  • Phase 2 – full closure of Bayou Gulch Road from the northern access point of the Vistancia neighborhood to Scott Avenue – road closure dates are Oct. 12, 2023, to May 2024. During Phase 2, all access points to the Vistancia neighborhood will be open.

Phase 2 Detour Map

 

Project Photos