This Project will widen Pine Lane from a 2-lane roadway section (one through lane in each direction) to include a center two-way left-turn lane between Dixon Drive and Pine Drive as well as provide a westbound right-turn deceleration lane at Dixon Drive. The project will improve safety, traffic operations, and reduce congestion. The design plans are about 60 percent complete and are now being finalized as IREA has determined how they will move forward with relocating their existing facilities along Pine Lane that are in conflict with the proposed improvements. IREA’s construction schedule needs to be delayed to provide them with adequate time to obtain several permanent easements.