Updated August. 16, 2023
Inverness Drive South bridge was re-opened on Thursday, August 10, 2023, however, the contractor still has to finish the final placement of polymer concrete on the bridge deck on (date TBD) in September. The moisture content of the bridge deck is critical for the correct placement of the polymer concrete top layer.